Dry fit starboard deck 
Stringers and bearers fabricated and glued into place 

























Part two is a larger radius epoxy fairing compound that sands to a smooth finish. The rigidity and strength these fillets give to the assembly is astounding. 
Two part filleting method. Part one is smaller radius high strength glue fillett … 
Transom detail 
Next step, applying the fibreglass. 
Rudder post installed and bonded to hull. 
Bonded to the hull using the two part filet method. 
Lots of touching up, prepping for glassing 
Many hours of sanding and detailing to prepare the hull for glassing. 
Ready for sheeting. 
This assembly looks innocent enoug, but due to the itersection of multipull angles, is probably the most technical woodworking to date. 
Outboard mount and well. 
Preparing for the step, outboard well and bridge deck. Stingline and laser level was used to ensure accuracy. This “partners” with the main bridgedeck,. 
Outboard topsides fitted 

Inboard topsides fitted 
Deb using the notched trowel to ensure full glue coverage. 
This shot gives an idea of the final dimensins of the boat, after the hulls are turned over. 
Port hull framed up ready for sheeting 

Frames erected. Next week we install the chines. 
Part hull commences. Erecting frame 5