Skip to primary content
Skip to secondary content

Building Selah

12 meter catamaran

Building Selah

Main menu

  • Home
  • About
    • The Sarah Design
    • Specifications
    • About Us
  • Photos
  • Building Selah
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
  • Sailing Selah
    • 2021
    • 2020
  • Extras
    • Tools
    • Electrics
    • Plumbing
    • Metalwork
    • Tanks
    • Helm Station
    • Sails
    • Rigging
    • Outboard Motors
  • Videos
  • For the Dreamers

Monthly Archives: July 2016

A great place to spend the days

Gallery

Posted on July 30, 2016 by Peter Imms

This gallery contains 7 photos.

The last few two weeks have settled into a regular routine. Pete gets up at around 6.30 and heads to the beach for some God (and personal) time: breakfast, then off to the site around 8am. Tarps are removed, Rex (resident watch … Continue reading →

Posted in 2016, The Build | Tagged Keels, Planking, Rudders | Leave a reply

Things we do on a rainy day

Gallery

Posted on July 21, 2016 by Peter Imms

This gallery contains 7 photos.

Well Selah has survived yet another wild nor’easter since our last post. She certainly has had a baptism of fire in her short life. If nothing else, it has reinforced in us the necessity of building strength into every joint. … Continue reading →

Posted in 2016, The Build | Tagged Keels, Planking, Plywood, Rudders, Shelter | 4 Replies

Planking commences

Gallery

Posted on July 10, 2016 by Peter Imms

This gallery contains 7 photos.

A week of good weather has seen us make steady progress. We have commenced planking the hull. First each plywood sheet is offered up to the hull and temporarily clamped in position. The edges are marked for trimming, and the location of the … Continue reading →

Posted in 2016, The Build | Tagged Planking | 1 Reply

Our plane has wings …

Gallery

Posted on July 10, 2016 by Peter Imms

This gallery contains 4 photos.

Now that all the stringers and chines have been glued in, we are beveling. This is the process of planing the chines and keel to match the frames, to provide a firm base for the sheeting. Selah is to be sheeted … Continue reading →

Posted in 2016, The Build | Tagged Beveling | Leave a reply

Enter your email address to follow this blog and receive notifications of new posts by email.

Recent Posts

  • Across Bass Strait May 9, 2021
  • The journey begins February 18, 2021
  • COVID update July 26, 2020
  • Dreams on hold … for now June 7, 2020
  • Everything has changed April 8, 2020

Archives

  • May 2021
  • February 2021
  • July 2020
  • June 2020
  • April 2020
  • January 2020
  • December 2019
  • November 2019
  • September 2019
  • August 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • October 2017
  • September 2017
  • August 2017
  • July 2017
  • June 2017
  • May 2017
  • April 2017
  • March 2017
  • February 2017
  • December 2016
  • November 2016
  • October 2016
  • September 2016
  • August 2016
  • July 2016
  • June 2016
  • May 2016
  • April 2016
  • March 2016
  • February 2016

Tags

  • Launch Day
  • Fiberglassing
  • Rudders
  • Turrett
  • Keels
  • Frames
  • Beams
  • Lower bridge deck
  • Building Site
  • Planking
  • Shelter
  • Bathroom
  • Strongbacks
  • Q Cell
  • Stern Steps
  • Cabin Sides
  • Floors
  • Saloon
  • Internal Fitout
  • Galley
  • Plywood
  • Web lockers
  • Shower
  • Marking Up
  • Alice Springs
  • Beveling
  • Outboards
  • Torture Board
  • Painting
  • Roll Over Day
  • Stringers
  • Metalwork
  • Outboard Motors
  • Tanks
  • Hoop Pine
  • Stringers
  • Outboard Pods
  • Targa
  • Cockpit
  • Sleeping Cabins
  • Fore Deck
  • Skin Fittings
  • Preparations
  • Fiberglassing
  • Rudders
  • Keels
  • Frames
  • Painting
  • Bathroom
  • Shelter
  • Q Cell
  • Beams
  • Lower bridge deck
  • Building Site
  • Launch Day
  • Galley
  • Planking
  • Saloon
  • Plywood
  • Stern Steps
  • Turrett
  • Floors
  • Internal Fitout
  • Strongbacks
  • Web lockers
  • Lockers
  • Navigation Station
  • Cabin Sides
  • Shower
  • Cockpit
  • Bedrooms
  • Mattress
  • Electrics
  • Decking
  • Hatches
  • Metalwork
  • Alice Springs
  • Targa
  • Stringers
  • Fore Deck
  • Preparations
  • Windows
  • Two Pack
  • Outboard Motors

Recent Comments

Peter Imms on Across Bass Strait
Phil Thompson on Across Bass Strait
Janet Lane on Across Bass Strait
Peter Imms on Across Bass Strait
Peter Imms on Across Bass Strait

Pages

  • About
    • The Sarah Design
  • About Us
  • Extras
  • For the Dreamers
  • Photos
  • Sailing Selah
  • Specifications
  • The Build
  • Tools
  • Videos
  • Welcome

Categories

  • 2016
  • 2017
  • 2018
  • 2019
  • 2020
  • 2021
  • Posts
  • Sailing Selah
  • The Build

Enter your email address to follow this blog and receive notifications of new posts by email.

Blog Stats

  • 80,152 hits

Gallery




Website Powered by WordPress.com.
  • Follow Following
    • Building Selah
    • Join 75 other followers
    • Already have a WordPress.com account? Log in now.
    • Building Selah
    • Customize
    • Follow Following
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...