Skip to primary content
Skip to secondary content

Building Selah

12 meter catamaran

Building Selah

Main menu

  • Home
  • About
    • The Sarah Design
    • Specifications
    • About Us
  • Photos
  • Building Selah
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
  • Sailing Selah
    • 2021
    • 2020
  • Extras
    • Tools
    • Electrics
    • Plumbing
    • Metalwork
    • Tanks
    • Helm Station
    • Sails
    • Rigging
    • Outboard Motors
  • Videos
  • For the Dreamers

Monthly Archives: March 2016

A lofty business

Gallery

Posted on March 18, 2016 by Peter Imms

This gallery contains 1 photo.

After the big day yesterday, we woke to a dull and drizzly morning. While the rain is much needed, as Tassy is in the grip of a water shortage, it was a bit chilly for our un acclimatised Northern Territory bones. … Continue reading →

Posted in 2016, The Build | Tagged Marking Up, Plywood | 5 Replies

Materials arrive

Gallery

Posted on March 17, 2016 by Peter Imms

This gallery contains 5 photos.

Today was a good day… One of the challenges when embarking on a major build project the size of Selah is researching and sourcing the materials, and then managing the vast amounts of it, when it arrives. Surprisingly we were … Continue reading →

Posted in 2016, The Build | Tagged Hoop Pine, Plywood | 1 Reply

Steam, Huon Pine, Tractors and war

Gallery

Posted on March 13, 2016 by Peter Imms

This gallery contains 5 photos.

Back in Alice winter was our festival season. Every weekend a concert or community event. Here in Tassy the summer weekends are full of potential activities to distract us from the build! But we are not complaining. Today we took … Continue reading →

Posted in 2016, The Build | 1 Reply

Strongback build

Gallery

Posted on March 11, 2016 by Peter Imms

This gallery contains 1 photo.

We had a bit of a win today. For some time I have been trying to think of a low cost way to build the strongbacks. They need to be straight and strong, but with a combined length of 48 … Continue reading →

Posted in 2016, The Build | Tagged Building Site, Strongbacks | Leave a reply

Ground-works underway

Gallery

Posted on March 8, 2016 by Peter Imms

Now that the shelter has been completed, we can commence preparing the site for the build. The two hulls are to be built concurrently upside down on ladder frames  called strongbacks – in nautical terms. The stongbacks keep all the … Continue reading →

Posted in 2016, The Build | Tagged Building Site, Strongbacks | Leave a reply

Shelter done

Gallery

Posted on March 4, 2016 by Peter Imms

This gallery contains 2 photos.

This morning with some help from family and friends the massive tarp was hoisted in place. Initially we wern’t sure how we were going to get the tarp over the 4.5M high frames, but after a suggestion from our sister-in-law … Continue reading →

Posted in 2016, The Build | Tagged Building Site, Shelter | Leave a reply

Shelter takes shape

Gallery

Posted on March 3, 2016 by Peter Imms

This gallery contains 1 photo.

Today we finished lifting the frames for the shelter. The job was made much easier by the use of a forklift, plus this time around I had pre-drilled all the connecting saddles and locating holes. Rob & Russ, Debs dad & … Continue reading →

Posted in 2016, The Build | Leave a reply

Enter your email address to follow this blog and receive notifications of new posts by email.

Recent Posts

  • Across Bass Strait May 9, 2021
  • The journey begins February 18, 2021
  • COVID update July 26, 2020
  • Dreams on hold … for now June 7, 2020
  • Everything has changed April 8, 2020

Archives

  • May 2021
  • February 2021
  • July 2020
  • June 2020
  • April 2020
  • January 2020
  • December 2019
  • November 2019
  • September 2019
  • August 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • October 2017
  • September 2017
  • August 2017
  • July 2017
  • June 2017
  • May 2017
  • April 2017
  • March 2017
  • February 2017
  • December 2016
  • November 2016
  • October 2016
  • September 2016
  • August 2016
  • July 2016
  • June 2016
  • May 2016
  • April 2016
  • March 2016
  • February 2016

Tags

  • Launch Day
  • Fiberglassing
  • Rudders
  • Turrett
  • Keels
  • Frames
  • Beams
  • Lower bridge deck
  • Building Site
  • Planking
  • Shelter
  • Bathroom
  • Strongbacks
  • Q Cell
  • Stern Steps
  • Cabin Sides
  • Floors
  • Saloon
  • Internal Fitout
  • Galley
  • Plywood
  • Web lockers
  • Shower
  • Marking Up
  • Alice Springs
  • Beveling
  • Outboards
  • Torture Board
  • Painting
  • Roll Over Day
  • Stringers
  • Metalwork
  • Outboard Motors
  • Tanks
  • Hoop Pine
  • Stringers
  • Outboard Pods
  • Targa
  • Cockpit
  • Sleeping Cabins
  • Fore Deck
  • Skin Fittings
  • Preparations
  • Fiberglassing
  • Rudders
  • Keels
  • Frames
  • Painting
  • Bathroom
  • Shelter
  • Q Cell
  • Beams
  • Lower bridge deck
  • Building Site
  • Launch Day
  • Galley
  • Planking
  • Saloon
  • Plywood
  • Stern Steps
  • Turrett
  • Floors
  • Internal Fitout
  • Strongbacks
  • Web lockers
  • Lockers
  • Navigation Station
  • Cabin Sides
  • Shower
  • Cockpit
  • Bedrooms
  • Mattress
  • Electrics
  • Decking
  • Hatches
  • Metalwork
  • Alice Springs
  • Targa
  • Stringers
  • Fore Deck
  • Preparations
  • Windows
  • Two Pack
  • Outboard Motors

Recent Comments

Peter Imms on Across Bass Strait
Phil Thompson on Across Bass Strait
Janet Lane on Across Bass Strait
Peter Imms on Across Bass Strait
Peter Imms on Across Bass Strait

Pages

  • About
    • The Sarah Design
  • About Us
  • Extras
  • For the Dreamers
  • Photos
  • Sailing Selah
  • Specifications
  • The Build
  • Tools
  • Videos
  • Welcome

Categories

  • 2016
  • 2017
  • 2018
  • 2019
  • 2020
  • 2021
  • Posts
  • Sailing Selah
  • The Build

Enter your email address to follow this blog and receive notifications of new posts by email.

Blog Stats

  • 80,152 hits

Gallery




Website Powered by WordPress.com.
  • Follow Following
    • Building Selah
    • Join 75 other followers
    • Already have a WordPress.com account? Log in now.
    • Building Selah
    • Customize
    • Follow Following
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...